Approve a load composition – Load Build Control (Employee)

  1. Click Load Build > Work with Plan > Control. The Load Build Control screen is displayed.
  2. Click Approve under Load Operations. The Approve Load Composition screen is displayed.
  3. Enter the required information.
  4. Click Submit. A message indicates the number of loads that were successfully approved and the number of loads that satisfied selection criteria but for which the approve operation could not be successfully performed.

See Also