Planning status
Transportation Manager will use Planning Status to define the extent by which the load could be modified and/or reworked. Planning Status will also be used in conjunction with other load attributes and the stop's Planning/Warehouse status to determine whether a load is eligible for re-planning by optimizer.
There is a relationship between the Load's Operational Status and Planning Status. A change to the Operational Status for a load could cause the Planning Status to be updated.
In this section
See Also