Assign a shipment to a new load (Employee)
- Perform one of the following tasks:
- Click Load Build > Work with Plan > Shipments > Unassigned. The list of Shipments Not Assigned to Loads is displayed.
- Display the list of optimized shipments (Employee).
- Select a shipment.
- Click Assign to New Load.
Note: If multiple shipment legs were selected, all legs are assigned to the same new load, if possible. Incompatible shipment legs (for example, conflicting commodity, freight terms, shipment consolidation class) are not assigned to the new load.
See Also