List of Shipments not Assigned to Loads (Employee)

This screen can be accessed in two different ways:

  1. Click Load Build > Work With Plan > Loads. The List of Loads Attached to Plan is displayed.
  2. Select a load.
  3. Click Shipments. The Assigned Shipments tab is displayed.
  4. Click the Unassigned Shipments tab.

OR

  1. Click Load Build > Work with Plan > Shipments > Unassigned.

Regardless of the access path, the list will present all shipment legs attached to the current plan that are not currently attached to any load and are in a status that would allow the shipment leg to be immediately attached to a load.

Tasks (all unassigned shipments)

Tasks (when accessed from Load Build > Work with Plan > Shipments > Unassigned)

See Also